Commercial
Absolute Solar have already installed more than 2 Mega-Watts of solar panel technology throughout South Australia and Queensland. Our Professional team of designers, installers, electricians, mechanical fitters and support staff have all the training, certification and knowledge to satisfy any size job. By ensuring our staff are all trained and qualified, we can be confident of handling any government solar, business solar and commercial solar installation. If you buy solar p ower systems from us, you can be assured of quality workmanship, products and service.
Site Visit
The first step in the process is for one of our technicians to come out
and perform a site check. This ensures that we are physically able to
install your solar power generation system and confirms if there are
any additional elements such as switchboard upgrades or remote wiring
that is required. Physical measurements are taken and a designs
are carefully considered to maximize the sun power that you can collect.
Planning and Quote
Once a plan and quote has been drawn up, we will present this to you. At this point, you can request any changes to the design and provide us with the Go Ahead to begin ordering materials and resources. We will then be able to provide a date for installation.
Installation
The solar installation procedure can vary depending on the size of the build. A typical job could range from 2 weeks for a 30KV system to 2 months for a MegaWatt system. During this time, we will be onsite until the system is operational and ready for commissioning.
Commissioning and Ongoing Maintenance
Once completed, we will commission the system, hooking it up to the main grid system.